Oil & Gas Project Management
Maxidyne Consulting is built on Marko Draca’s track record of leading complex, high-pressure projects in the oil and gas industry – stepping in where strong leadership is needed to rectify troubled projects or respond immediately to critical events such as fires or emergencies.
Marko’s specialty is rapid response: de-escalating high-risk situations and developing and implementing effective solutions within tight timeframes, without compromising on safety or quality.
Case example: Moomba absorber corrosion response
When corrosion issues were identified in an absorber vessel at Moomba, Marko led the response from initial discovery through to full resolution. The project scope included a complete absorber weld inlay repair and in-situ post-weld heat treatment of the vessel – a technically demanding scope of work that was managed and executed within just four weeks of the issue being identified.
This project reflects the core of what Maxidyne offers: the ability to move fast, make sound engineering decisions under pressure, and deliver a safe, lasting fix when the timeline doesn’t allow for a conventional project cycle.
Whether you’re dealing with a troubled project that needs strong leadership to get back on track, or an urgent situation demanding immediate technical response, Maxidyne Consulting brings the experience and composure to deliver.